Stormwater "Ground Control"
"Ground Control: Stormwater Pollution Prevention for Construction Sites"

This employee training kit is designed to show employees how erosion, sediments and other potential surface water pollutants are controlled at construction sites. The program focuses on Best Management Practices (BMPs) that are widely used at most construction sites including: silt fence, stabilized entrances/exits, drop inlet protectors and others. The program illustrates how these BMPs work and how they can fail. Employees are encouraged to promptly report any failing BMPs. By making all employees "look-outs" for BMP problems, this training program is an important part of the required BMP maintenance program.

Available in English or Spanish.
Price $495.00

Stormwater "Ground Control"

$495.00Price
Language
Format
  • Details

    • Program includes DVD, USB, or CD-Rom: (14½ min.)
    • Trainer's Guide
    • Employee quizzes
    • Training sign-off forms
    • Stormwater Guidebooks

Excal Visual, Inc.

​PO Box 4463

Avon, CO 81620

Toll Free: 1-(888)-925-6554

Office:1-(303)-413-0847

Fax: 1-(720)-815-0284

Email: training@excalvisual.com

© 2020

  • LinkedIn
  • Facebook
  • YouTube Social  Icon
EV logos 2 copy 2.jpg